Water Treatment Plant For Chantaburi Farm

Water Treatment Plant For Chantaburi Farm

Client: Chantaburi Farm Co., Ltd

Location: Chantaburi, Thailand

Features: Pre-fabricated steel WTP with turnkey design and construction delivery method.

Completion Date: November 1993; 7 months period

Contract Value: 9.2 MB

Aquathai had designed, constructed, supplied, installed and commissioned of a water treatment plant for the private resort in Chantaburi. This surface water treatment plant use the high rate clarifier and rapid sand filters. The capacity is 2,400 m3/d.
The scope of work include:
  • Sludge Blanket Clarifier
  • Sand filters with a backwash facility
  • All pumps in the WTP
  • Chemical feed system
  • Elevated tank, 100m3
  • Electrical and instrument work