Skip to content
Aquathai.Co.,LTD
  • Home
  • About us
  • Product
  • Project Reference
  • Contact

Coronavirus disease 2019

DivaSpin : guide complet de l’application mobile et du casino sur smartphone

Digital Fairness in the Age of Big Tech

Test post title

Test post title

Test post title

September 5, 2015September 9, 2015 adminWater & Wastewater

Filter Control System for WTP

Filter Control System for WTP Client: Metropolitan Waterworks Authority (MWA) Location: Bangkok, Thailand Features: Automatic Control system for filters Completion Date: April 1991 Contract Value: THB 7,500,000 (C110/2533) Aquathai had supply and install the filterContinue reading

September 5, 2015September 9, 2015 adminWater & Wastewater

Water and Wastewater Treatment Plant at Myojo

Water and Wastewater Treatment Plant at Myojo Client: Thai President Food (Public) Co., Ltd. Location: Rayong Completion Date: November 2001 Contract Value: 24 MB total for WTP, WWTP and Recycle water treatment plant Aquathai wasContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Mobile Plant at Rama VI Bridge

Mobile Plant at Rama VI Bridge Client: Metropolitan Waterworks Authority (MWA) Location: Nonthaburi, Thailand Features: Pre-fabricated steel WTP with a tight space available. Innovative design with space saving with low operation and maintenance cost andContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Ratchaburi-Samutsongkram water treatment plants

Ratchaburi-Samutsongkram water treatment plants Client: Egcom Tara Co., Ltd. Location: Ratchaburi and Samutsongkram, Thailand Challenges and Solution: The turnkey construction of complete water treatment and distribution system including all design and permits. Excellent planning andContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Construction and expansion of water supply for samut sakorn

Construction and expansion of water supply for samut sakorn Client: Provincial Water Works Authority (PWA) Location: Samut Sakorn Features: Conventional PWA Water Treatment Work and pumping stations Completion Date: January 1998 Contract Value: 262.2 MB,Continue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Mobile Plant at Wellgrow Industrial Complex (Phase I & 2)

Mobile Plant at Wellgrow Industrial Complex (Phase I & 2) Client: Wellgrow Industrial Co., Ltd. Location: Bangkok, Thailand Features: Pre-fabricated steel WTP with innovative design featuring high rate process equipment with low operation and maintenanceContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Package Wastewater System for Low Cost Housing (Aua-Arthon) Project

Package Wastewater System for Low Cost Housing (Aua-Arthon) Project Client: National Housing Authority of Thailand (through Italian-Thai Development (Plc)) Location: Various locations (Bangkok and Greater Bangkok Area) Features: Concrete tank with anaerobic filter followed byContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Wastewater Treatment Plant at Don Muang International Airport

Wastewater Treatment Plant at Don Muang International Airport Client: Big World Siam Co., Ltd. Location: Bangkok Features: RBC wastewater treatment plant with sludge digestion Completion Date: January 2002 Contract Value: 16 MB of total 150Continue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Wastewater Treatment Plant at Eastern Industrial Estate (EIE)

Wastewater Treatment Plant at Eastern Industrial Estate (EIE) Client: Eastern Industrial Estate (EIE) Location: Rayong Features: Concentric tank configuration of bioreactor and clarifier Completion Date: December 1994 Contract Value: 71.2 MB Aquathai worked as theContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Wastewater Treatment Plant at Maptaput Industrial Estate

Wastewater Treatment Plant at Maptaput Industrial Estate Client: IEAT and Italian-Thai Development (ITD) Location: Rayong Features: Series of WWTP in various locations within the Industrial Complex Completion Date: February 1992 Contract Value: 31.45 MB, totalContinue reading

Posts navigation

Older posts
Newer posts
  • English
  • ไทย

Recent Posts

  • Coronavirus disease 2019
  • DivaSpin : guide complet de l’application mobile et du casino sur smartphone
  • Digital Fairness in the Age of Big Tech
  • Test post title
  • Test post title

Archives

  • April 2026
  • March 2026
  • August 2025
  • September 2015
  • January 1970

Categories

  • 1
  • Product
  • public
  • Uncategorized
  • Water & Wastewater
  • English
  • ไทย
Proudly powered by WordPress | Theme: Oria by JustFreeThemes.