September 5, 2015September 8, 2015 adminWater & Wastewater

Water Treatment Plant For Industry of Siam Cement Industrial Estate at Rayong

Water Treatment Plant For Industry of Siam Cement Industrial Estate at Rayong Client:nRayong Industrial Land Co., Ltd. Location: Mab Kha, Rayong, Thailand Features: Pre-fabricated steel WTP with innovative design featuring high rate process equipment andContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Upgrading and Improvement of Water treatment plant at Suranaree University

Upgrading and Improvement of Water treatment plant at Suranaree University Client: University of Technology of Suranaree Location: Nakorn Ratchasima Features:Upgrading and improvement work with a new advance water treatment plant Completion Date: November 1998 ContractContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Water treatment plant at Tapioca Development

Water treatment plant at Tapioca Development Client: Tapioca Development Co., Ltd. Location: Banchang, Rayong Features: Very small footprint water treatment plant. Using its own water source as a substitute to other expensive raw  water source.Continue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Expansion and Rehabilitation Work at Chacheongsao Water

Expansion and Rehabilitation Work at Chacheongsao Water Client: Chacheongsao Water Company Location: Chacheongsao, Thailand Challenges: The construction and rehabilitation activities were performed without interruption of water production. Solution: Good project control and planning were implemented.Continue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Construction and expansion of water supply for Thai Cogeneration

Construction and expansion of water supply for Thai Cogeneration Client:Thai Cogeneration (Public) Co., Ltd Location: Rayong, Thailand Features: High water quality of output in both pretreatment and demineralization system is required with automatic control inContinue reading

September 5, 2015September 7, 2015 adminWater & Wastewater

Mobile Plant at Klong Taveewattana

Mobile Plant at Klong Taveewattana Client: Metropolitan Waterworks Authority (MWA) Location: Bangkok, Thailand Features:Pre-fabricated steel WTP with a tight space available. Innovative design with space saving with low operation and maintenance cost and easy toContinue reading

September 5, 2015September 7, 2015 adminWater & Wastewater

Construction of Bangpakong Water Treatment Plant Phase I&II

Construction of Bangpakong Water Treatment Plant Phase I&II Client: Provincial Water Works Authority (PWA) Location: Bangpakong, Chacheongsao Features: Conventional construction work of PWA Completion Date: March 1997 Contract Value: 228.4 MB, including VAT The constructionContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Construction of Bangpakong Water Treatment Plant Phase III

Construction of Bangpakong Water Treatment Plant Phase III Client: Provincial Water Works Authority (PWA) Location: Bangpakong, Chacheongsao Features: High Rate Sludge Blanket Clarifier and Rapid Sand Filters Completion Date: July 1994; 15 months Contract Value:Continue reading

September 5, 2015September 7, 2015 adminWater & Wastewater

Pumping Station at Chacheongsao (C3A)

Pumping Station at Chacheongsao (C3A) Client: East Water and IT Location: Chacheongsao Features: Pumping and air suppression system for large pumps. Accessories include vibration and temperature sensor and zero leakage butterfly valves Completion Date: NovemberContinue reading

September 5, 2015September 7, 2015 adminWater & Wastewater

Water Treatment Plant For Chantaburi Farm

Water Treatment Plant For Chantaburi Farm Client: Chantaburi Farm Co., Ltd Location: Chantaburi, Thailand Features: Pre-fabricated steel WTP with turnkey design and construction delivery method. Completion Date: November 1993; 7 months period Contract Value: 9.2Continue reading

Posts navigation

Older posts
Newer posts
  • English
  • ไทย

Recent Posts

  • Coronavirus disease 2019
  • DivaSpin : guide complet de l’application mobile et du casino sur smartphone
  • Digital Fairness in the Age of Big Tech
  • Test post title
  • Test post title

Archives

  • April 2026
  • March 2026
  • August 2025
  • September 2015
  • January 1970

Categories

  • 1
  • Product
  • public
  • Uncategorized
  • Water & Wastewater
  • English
  • ไทย
Proudly powered by WordPress | Theme: Oria by JustFreeThemes.