Skip to content
Aquathai.Co.,LTD
  • Home
  • About us
  • Product
  • Project Reference
  • Contact

Coronavirus disease 2019

DivaSpin : guide complet de l’application mobile et du casino sur smartphone

Digital Fairness in the Age of Big Tech

Test post title

Test post title

Test post title

September 8, 2015September 8, 2015 adminUncategorized

FLOOD PROTECTION AT SAMUTSAKORN

FLOOD PROTECTION AT SAMUTSAKORN Client: Public Works Department, Ministry of Interior (under ITD’s subcontract) Location: Krok Krak, Samutsakorn, Thailand Features: Supply, installation and testing of pumping and electrical and PLC work Completion Date: Dec 2008Continue reading

September 8, 2015September 8, 2015 adminUncategorized

Mandalay International Airport

Mandalay International Airport Client: Mandalay International Airport Location: Mandalay, Myanmar Highlight of Features: The BNR wastewater treatment plant with a mechanical dewatering using sludge centrifuge and complete with an effluent reuse or tertiary treatment system.Continue reading

September 8, 2015September 8, 2015 adminWater & Wastewater

JATUJAK (BMA-4) WASTEWATER TREATMENT PLANT BANGKOK, THAILAND

JATUJAK (BMA-4) WASTEWATER TREATMENT PLANT BANGKOK, THAILAND SUMMARY The project involves the turnkey design, construction, commissioning, and operation (one year) of the wastewater collection and treatment facilities for the Bangkok Metropolitan Authority. The BMA 4Continue reading

September 8, 2015September 8, 2015 adminWater & Wastewater

INDIRAPURAM STP, GHAZIABAD, UTTAR PRADESH JAL NIGAM, INDIA

INDIRAPURAM STP, GHAZIABAD, UTTAR PRADESH JAL NIGAM, INDIA Client: Yamuna Pollution Control Unit through UEM (the main contractor) Location: Ghaziabad, U.P. Jal Nigam, India Highlight of Features: SBR process to treat the domestic and industrialContinue reading

September 8, 2015September 8, 2015 adminWater & Wastewater

Four Seasons, Samui- Grey Water System

Four Seasons, Samui- Grey Water System Client: Four Seasons, Samui (Minor Group) Location: Samui, Thailand Highlight of Features: The system upgrading of the existing WWTP of the Four Seasons Resort in Samui. The addition ofContinue reading

September 8, 2015September 8, 2015 adminWater & Wastewater

G-MS4-8 Expansion of Mahasawat Water Treatment Plant and Related Works

G-MS4-8 Expansion of Mahasawat Water Treatment Plant and Related Works Client: Metropolitan Waterworks Authority (MWA) Location: Nonthaburi , Thailand Features: Large scale WTP with common facility saving the capital expenditure and operation and maintenance cost.Continue reading

September 8, 2015September 8, 2015 adminWater & Wastewater

Nakornratchasima (Korat) Water Supply

Nakornratchasima (Korat) Water Supply Client: Municipality of Metropolitan Nakornratchasima Location: Nakornratchasima, Thailand Features: Completion Date: Contract Value: 647.5 MB of total 3,060 MB Aquathai had worked as a consortium partner to the Consortium of SAContinue reading

September 7, 2015September 8, 2015 adminWater & Wastewater

Bangkhen Water Treatment Plant (Plan 7)

Bangkhen Water Treatment Plant (Plan 7) Client: Metropolitan Waterworks Authority (MWA) Location: Bangkok, Thailand Features: Large scale WTP- Sludge recirculation clarifier and dual-media filter Completion Date: September 3, 2005 Contract Value: 34 MB of totalContinue reading

September 7, 2015September 8, 2015 adminProduct

Product Water & Wastewater

Product Water & Wastewater  

September 7, 2015September 8, 2015 adminProduct

Product Aquafilt

Product Aquafilt  

Posts navigation

Older posts
Newer posts
  • English
  • ไทย

Recent Posts

  • Coronavirus disease 2019
  • DivaSpin : guide complet de l’application mobile et du casino sur smartphone
  • Digital Fairness in the Age of Big Tech
  • Test post title
  • Test post title

Archives

  • April 2026
  • March 2026
  • August 2025
  • September 2015
  • January 1970

Categories

  • 1
  • Product
  • public
  • Uncategorized
  • Water & Wastewater
  • English
  • ไทย
Proudly powered by WordPress | Theme: Oria by JustFreeThemes.