Skip to content
Aquathai.Co.,LTD
  • Home
  • About us
  • Product
  • Project Reference
  • Contact

เมื่อเกมเดิมพันดูง่ายขึ้นกับอินเทอร์เฟซที่ไม่ซับซ้อนจาก 188BET

Test Post Created

Instant payout casinos that keep the cash flowing while you play

Test Post Created

Spielspaß leicht gemacht mit den besten Online Casinos Österreichs im Blick

Test Post Created

September 5, 2015September 7, 2015 adminWater & Wastewater

Mobile Plant at Klong Taveewattana

Mobile Plant at Klong Taveewattana Client: Metropolitan Waterworks Authority (MWA) Location: Bangkok, Thailand Features:Pre-fabricated steel WTP with a tight space available. Innovative design with space saving with low operation and maintenance cost and easy toContinue reading

September 5, 2015September 7, 2015 adminWater & Wastewater

Construction of Bangpakong Water Treatment Plant Phase I&II

Construction of Bangpakong Water Treatment Plant Phase I&II Client: Provincial Water Works Authority (PWA) Location: Bangpakong, Chacheongsao Features: Conventional construction work of PWA Completion Date: March 1997 Contract Value: 228.4 MB, including VAT The constructionContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Construction of Bangpakong Water Treatment Plant Phase III

Construction of Bangpakong Water Treatment Plant Phase III Client: Provincial Water Works Authority (PWA) Location: Bangpakong, Chacheongsao Features: High Rate Sludge Blanket Clarifier and Rapid Sand Filters Completion Date: July 1994; 15 months Contract Value:Continue reading

September 5, 2015September 7, 2015 adminWater & Wastewater

Pumping Station at Chacheongsao (C3A)

Pumping Station at Chacheongsao (C3A) Client: East Water and IT Location: Chacheongsao Features: Pumping and air suppression system for large pumps. Accessories include vibration and temperature sensor and zero leakage butterfly valves Completion Date: NovemberContinue reading

September 5, 2015September 7, 2015 adminWater & Wastewater

Water Treatment Plant For Chantaburi Farm

Water Treatment Plant For Chantaburi Farm Client: Chantaburi Farm Co., Ltd Location: Chantaburi, Thailand Features: Pre-fabricated steel WTP with turnkey design and construction delivery method. Completion Date: November 1993; 7 months period Contract Value: 9.2Continue reading

September 5, 2015September 9, 2015 adminWater & Wastewater

Filter Control System for WTP

Filter Control System for WTP Client: Metropolitan Waterworks Authority (MWA) Location: Bangkok, Thailand Features: Automatic Control system for filters Completion Date: April 1991 Contract Value: THB 7,500,000 (C110/2533) Aquathai had supply and install the filterContinue reading

September 5, 2015September 9, 2015 adminWater & Wastewater

Water and Wastewater Treatment Plant at Myojo

Water and Wastewater Treatment Plant at Myojo Client: Thai President Food (Public) Co., Ltd. Location: Rayong Completion Date: November 2001 Contract Value: 24 MB total for WTP, WWTP and Recycle water treatment plant Aquathai wasContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Mobile Plant at Rama VI Bridge

Mobile Plant at Rama VI Bridge Client: Metropolitan Waterworks Authority (MWA) Location: Nonthaburi, Thailand Features: Pre-fabricated steel WTP with a tight space available. Innovative design with space saving with low operation and maintenance cost andContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Ratchaburi-Samutsongkram water treatment plants

Ratchaburi-Samutsongkram water treatment plants Client: Egcom Tara Co., Ltd. Location: Ratchaburi and Samutsongkram, Thailand Challenges and Solution: The turnkey construction of complete water treatment and distribution system including all design and permits. Excellent planning andContinue reading

September 5, 2015September 8, 2015 adminWater & Wastewater

Construction and expansion of water supply for samut sakorn

Construction and expansion of water supply for samut sakorn Client: Provincial Water Works Authority (PWA) Location: Samut Sakorn Features: Conventional PWA Water Treatment Work and pumping stations Completion Date: January 1998 Contract Value: 262.2 MB,Continue reading

Posts navigation

Older posts
Newer posts
  • English
  • ไทย

Recent Posts

  • เมื่อเกมเดิมพันดูง่ายขึ้นกับอินเทอร์เฟซที่ไม่ซับซ้อนจาก 188BET
  • Test Post Created
  • Instant payout casinos that keep the cash flowing while you play
  • Test Post Created
  • Spielspaß leicht gemacht mit den besten Online Casinos Österreichs im Blick

Archives

  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • August 2025
  • September 2015
  • January 1970

Categories

  • 1
  • Product
  • public
  • Uncategorized
  • Water & Wastewater
  • English
  • ไทย
Proudly powered by WordPress | Theme: Oria by JustFreeThemes.